Permanent Screw Jacks
Permanent Screw Jacks

Permanent Screw Jacks

Product Name: Screw Jack
Material: Alloy Steel / Carbon Steel / Cast Steel / Stainless Steel (The lead screw is usually tempered or quenched, nuts can be made of bronze or engineering plastics)
Usage: Precise lifting, positioning, synchronized lifting, long-term load support
Appearance: Spray-painted, Corrosion-resistant Coating, Can come with a Dust Cover and Lubrication Interface
Origin: China (One of the main manufacturing locations)
Manufacturing Process: Turning / Grinding / Milling / Heat Treatment, Assembly, Testing
Certifications: ISO9001, CE, Relevant Industry Standards (DIN/AGMA/EN)

Permanent Screw Jacks for Foundation, Floor and Equipment Support

Foundations settle. Floors sag. In both cases the support has to be something you can re-level later. FLA Industrial supplies Permanent Screw Jacks for foundation repair, floor support and heavy equipment bases. Ultimate load capacity goes from 20,000 lbs to over 60,000 lbs. Steel can be alloy, carbon, cast or stainless. Lead screws come tempered or quenched. Nuts are bronze or engineering plastic. You can order spray paint. Hot-dip galvanizing is another choice, and so is fusion-bonded epoxy powder coating. A dust cover is available too, plus a lubrication interface. Send over your load range and ask for a quotation.

What Are jacks?

This product is a mechanical support. Once it goes in, it stays there and carries load for years. You will find them under settling foundations. Same goes for structural beams and sagging floor joists. Temporary shoring posts work differently. They only hold things up while the construction is going on. These jacks stay in the structure. Should the support ever need re-leveling, an adjustment later takes care of it.

Precise lifting is one common use. Positioning is another. So is synchronized lifting. Other jobs call for long-term load support. Down in crawl spaces and basements, they act as an adjustable stand-in for fixed columns or timber posts. Whether that fits depends on site conditions and the engineering requirements.

Permanent Screw Jacks

Materials and Construction

Alloy steel is a common pick for the base material. Carbon steel works as well. Cast steel and stainless steel are two more options. The column uses steel to ASTM A500 or A53. Wall thickness is often Schedule 40 or 80.

The lead screw is solid steel. Its diameter is over 1 in. It is tempered or quenched and has Acme threads. For the nut, bronze is one choice. Engineering plastic is another. A locking collar or a double-nut system helps hold the setting. Height can be adjusted with the tele-post design. That lets you re-level later.

Specifications

Model (t) Top Cover (mm) Bottom Cover (mm) Minimum Height (mm) Lifting Height (mm) Weight (kg)
3.2 49 93 220 110 17.4
5 49 93 250 130 21.5
8 49 104 260 140 22.3
10 59 104 280 150 27.2
16 64 118 320 180 21.1
20 64 128 325 180 23.1
25 64 128 275 130 20.9
32 69 142 395 200 37.2
50 88 186 452 250 36.1
100 125 238 452 200 71.3
D10 59 104 200 75 22.4
D20 64 128 225 90 19.3
D32 69 142 320 150 33.4
D50 88 186 330 150 28.9

This page does not give dimensions or unit weight for each model. Ask for both when you send your quotation request.

product-1-1

Surface Protection and Finish Options

Bare steel rusts in a wet crawl space. That is why the finish you choose counts. Three options are open to you:

  • Spray-painted carbon steel: this is the common coating. It keeps rust away.
  • Hot-dip galvanized steel: zinc sits on the base metal here. Damp places suit it well.
  • Fusion-bonded epoxy powder coating: heat bakes this finish on.

A dust cover plus a lubrication interface keeps the threads better protected. Make thread checks a routine part of preventive maintenance. When you request a quote, say which finish fits your environment.

product-1-1

Applications of Permanent Screw Jacks

You will find Permanent Screw Jacks in three common situations:

  • Crawl space remediation: Moisture rot makes floor joists sag. So do piers spaced too wide in the original build. Those joists need lifting and stabilizing. In damp spaces, choose a finish that resists corrosion. Then compare the jack height with the clearance you really have.
  • Industrial equipment retrofitting: Once new heavy machinery goes in, concrete slabs or sub-floors often need support. The jacks act as extra point-load supports here. Get a qualified engineer to sign off on the load path and the footing.
  • Load-bearing wall removal: Steel I-beams or LVL beams carry the load once the walls come out. The height can be adjusted, so you can level the beam as it slides into place.

Manufacturing Process and Quality Control

Turning, grinding, milling, heat treatment, assembly and testing all happen in production. ISO9001 quality management and CE product safety certification are in place for most Products" target="_blank" style="color:blue" >products. Want to know which certificates cover your model? Just ask.

This product usually get a 2.5:1 or 3:1 safety factor on working load ratings. Load verification is a common contractor request. So is weld inspection of the top and base plates. Coating checks come up as well. Send your inspection requirements along with the quote request and we will confirm what can be provided for your order.

product-1-1

Customization and Technical Support

Custom special-shaped parts are FLA's main focus. The company develops non-standard sizes and special structures for machinery, building materials and other industries. Support is provided at each stage:

  • Early stage: we build the mold for custom parts. 3D design and checks also happen here, before production starts.
  • Mid stage: layout review and confirmation of material, performance and dimensional accuracy.
  • Late stage: production progress feedback matched to delivery progress.

Supply and Delivery

For standard products, FLA keeps 2,000 tons of inventory on hand. Custom special-shaped parts for Permanent Screw Jacks can ship in as little as 7–15 days. Ask about pricing, unit weight or 3D design and you will hear back within 24–48 hours. When you request a quote, confirm the lead time for your own jack configuration.

FAQ

Q: How are these jacks different from temporary shoring posts?

A: Temporary shoring posts are used during active construction and then removed. These jacks are designed to remain in place as long-term support and can be re-leveled later.

Q: Can this product be adjusted after installation?

A: Yes. The tele-post design provides adjustable height, so the jack can be raised later to re-level the structure if settlement continues.

Q: Do they require a concrete footing?

A: The load has to reach stable support. Footing type and size follow the load and the soil. Have a qualified engineer confirm the design.

Q: Do they meet local building codes?

A: Code requirements vary by project. Code evaluation reports are not listed on this page, so ask us which documents are available for your model and confirm local requirements before purchase.

Q: In a wet crawl space, what keeps them from rusting?

A: Pick the coating that suits the site. Spray paint is one option. Hot-dip galvanizing and fusion-bonded epoxy powder are two more. A dust cover and a lubrication interface can be added if you need them. Check the threads on a regular schedule.

Q: How fast can custom parts be delivered?

A: Custom special-shaped parts ship in 7–15 days at the fastest. Send over your drawings or the load requirements. You will hear back in 24–48 hours.

Contact Us

Send your load range, column diameter and finish to sales@flaindustrial.com. We reply within 24–48 hours with pricing, unit weight or 3D design for your Permanent Screw Jacks.

hot tags: Permanent Screw Jacks,China,manufacturers,factory,made in China,for sale,wholesale,customized,in stock,buy discount,pricelist.

YOU MAY LIKE